Public Deliverables

Deliverable Report D 7.3: Standardization plan and review of regulatory situation and standards

  • Posted on: 19 June 2020
  • By: Admin

This document provides, as a first result of the standardization activity, a collection of applicable standards that shall be taken into account in the architectural framework and design choices for the SILENSE project. This is done in order to find a common solution to assure a smooth and homogeneous way to assure a very high level of interoperability (or at least interworking) among the different systems. The deliverable presents a first selection of standards under developments that could be of interest for the Project standardization activities.

Deliverable Report D 6.4: Demonstrator performance and validation results

  • Posted on: 19 June 2020
  • By: Admin

This report describes the final status of the demonstrator prototypes which have been successfully designed and developed in the SILENSE project, based on the use cases and specifications defined. The report includes a summary of all the activities developed for each of the demonstrators, including the design of hardware and software solutions, various stages of prototyping and integration and validation activities at each foreseen validation scenario.

This deliverable will be available after Approval by the Commision.

Deliverable Report D 2.5: Micro sound transducers summary

  • Posted on: 19 June 2020
  • By: Admin

Within the framework of the ECSEL project SILENSE, several ultrasound transducer technol-ogies are pushed forward, ahead of the state-of-the-art. This includes novel microphones that are also sensitive in the ultrasound domain, new piezoelectric materials, and large arrays of ultra-sound transducers on glass or flexible substrates. Several of these technologies are used in SILENSE demonstrators, while other technologies will be available for post-SILENSE demon-strators and even products. The status of the different technologies is described in this public deliverable.

Deliverable Report D 1.1.2: Application analysis and definition of use cases

  • Posted on: 8 May 2018
  • By: Admin

Preliminary set of use cases for the innovative ultrasound technologies has been collected and elaborated on.At the end of the first project year these use cases have been revised considering the work that has been done so far as the feasibility and viability has been checked in the mean time. The result of this revision, including also some new application areas and use cases, is presented in this document as the final application analysis and use case definition.

Deliverable Report D 7.1: Dissemination and Communication plans

  • Posted on: 15 December 2017
  • By: Admin

This public deliverable report summarizes the initial ideas and presents useful channels for dissemination of SILENSE project results. It also set up policies and rules for dissemination activities and provides the first estimation of volume of planned activities. Also, communication activities are described and specific procedures for each communication channel is adopted.

Deliverable Report D 1.1.1: Preliminary application analysis and definition of use cases

  • Posted on: 1 September 2017
  • By: Admin

The deliverable is the first outcome of WP 1 Task 1.1 of Silense. The aim of the deliverable is to give a preliminary description of the targeted application domains and specific use cases towards which the Silense development and demonstrator efforts will be focused.